Contents

EXECUTIVE SUMMARY

1               INTRODUCTION

2               SUMMARY OF EM&A REQUIREMENTS AND MONITORING RESULTS

3               LANDSCAPE AND VISUAL

4               LAND CONTAMINATION

5               SITE INSPECTION AND AUDIT

6               NON-COMPLIANCE, COMPLAINTS, NOTIFICATIONS OF SUMMONS AND SUCCESSFUL PROSECUTIONS

7               IMPLEMENTATION STATUS OF ENVIRONMENTAL MITIGATION MEASURE

8               CONCLUSION AND RECOMMENDATION

 

Tables

Table 1                    Contact Information of Key Personnel

Table 2                    Main Construction Works carried out in the Reporting Period

Table 3                    Air Quality and Noise Monitoring Locations

Table 4                    Coordinates of Water Quality Monitoring Locations

Table 5                    Summary of Water Quality Exceedance

Table 6                    Observations and Recommendations of Site Audit

Table 7                    Waste Generated by the Construction and Disposal Ground

Table 8                    Status of submissions required under the EP

 

Figures

Figure 1               Location of Proposed Yuen Long Effluent Polishing Plant.

Figure 2               Location of Construction Dust Monitoring Stations.

Figure 3               Noise Monitoring Locations.

Figure 4               Water Quality Monitoring Locations.

Figure 5               Ecology Monitoring Locations.

Figure 6                  Active Night Roost Monitoring Area and Vantage Points; And Noise Monitoring Stations. 6

 

Appendix

Appendix A     Construction Programme

Appendix B     Project Organization Chart

Appendix C     Action and Limit Levels

Appendix D     Graphical Presentation of Monitoring Data

Appendix E     EVENT AND ACTION PLANS

Appendix F     WASTE FLOW TABLE

Appendix G     Implementation Status of Environmental Mitigation Measures

Appendix H     Cumulative statistics on Environmental Complaints, Notifications of Summons and Successful Prosecutions